Construction applications and permits
I have a character (let's call him Mr. X) building a club in NYC. I need him to have a problem during construction that slows him down a little--maybe 2-3 weeks. I'm thinking he's got a Fire and Building Code problem that needs to be fixed to get his Place of Assembly permit. I'm on the NYC Buildings website and I think I get what I can do, but I'm hoping someone with construction/design experience can verify these things for me. Thanks!
1. Mr. X finds the appropriate property, has an architect draw up plans that comply with the Fire and Building Code requirements and that allows Mr. X to get a Certifcate of Occupancy. Now he can start work. 2. Construction company comes in and does said work. Interior designers come in and do some of their own things. 3. Before club can open, an inspector must come in and make sure the club is according to plans and there are no safety violations. 4. Inspector finds problem and denies Mr. X his Place of Assembly permit (this permit comes at the end, after everything is done and the inspection made, right?). 5. Now, who is to blame for said problems (for now, let's say some small partitions were put up and/or seating changed a bit that effected emergency egress)? Does the architect stay with the project the whole time, so he should have overseen deviations by the construction crew? Or what if these were free-standing partitiions put in by the interior designers--who should have been overseeing what they did (not sure if they would ever do something like this)? This whole bit is rather short in the book--maybe a paragraph or two. I just need Mr. X to be mad his plans are delayed (and be distracted by an afternoon at the NYC Buildings office) and have someone to blame. Then he can fix the issues and move on. Last edited by krashnburn; 01-11-2013 at 09:46 PM. |
|
|
|
|
|
#2 |
|
Strangeness is conserved
Join Date: Jan 2008
Location: Minnesota, USA
Posts: 2,688
![]() ![]() ![]() ![]() ![]() ![]() |
1. You don't get a certificate of occupancy until after construction is completed. The building permit is issued before construction, then the building inspector comes and verifies that what was built complies, and then issues the certificate.
2. Yes. Interior designer should not be adding any partitions. 3. What I just said for #1. 4. Yes. It is called the occupancy permit. Assembly is a type of occupancy, one that has special rules. And yes, a club is considered to be assembly. 5. The architect is responsible, as he has to approve any changes made from the drawings during the construction period. The contractor is also responsible, for having to report any changes. If the contractor made changes without informing anyone, then he is responsible. If the architect approved changes, then he is responsible. The architect should oversee any additional walls installed by the interior designer, as these affect egress and occupancy, etc. The contractor should not put up any partitions that the architect did not approve. Likewise, the Interior designer should not be issuing any directives to the contractor without going through the architect.
__________________
I went to Troy and all I got was this stupid vase. Strangeness is conserved Links on demand. The temple explodes the chicken cube. Sodium: Don't get it wet. I wish people would stop mistaking my not agreeing for not understanding. |
|
|
|
|
|
#3 |
|
I'm killing bad guys
Join Date: Mar 2012
Location: NY
Posts: 450
![]() ![]() |
Thank you!!!!!!!!!
|
|
|
|
|
|
#4 |
|
God of the Oceans
Join Date: Oct 2012
Posts: 539
![]() |
I agree with Sarpedon, but if the work was done according to the plans, and there was a problem that kept it from getting a CO, then the permit was issued in error, and the owner can take action against the inspections department.
|
|
|
|
|
|
#5 |
|
practical experience, FTW
Join Date: Jul 2012
Posts: 1,867
![]() ![]() ![]() ![]() ![]() ![]() |
He has an architect, a gc, etc., he's probably not at the permit office himself - they file the stuff, not him.
Just btw, he could also have a liquor license problem, which seems just simpler to me, if you just want a random delay. |
|
|
|
|
|
#6 |
|
God of the Oceans
Join Date: Oct 2012
Posts: 539
![]() |
Or you could have one of the subcontractors be a thief who did not follow the plans.
|
|
|
|
|
|
#7 | |
|
I'm killing bad guys
Join Date: Mar 2012
Location: NY
Posts: 450
![]() ![]() |
Quote:
I have no idea what goes into getting a liqour license: what problems would arise and how would that be simpler? And thanks to everyone for responding! |
|
|
|
|
|
|
#8 |
|
God of the Oceans
Join Date: Oct 2012
Posts: 539
![]() |
Liquor licenses can be Hellish. If you just want the owner to be slightly delayed, then leave it as a problem with egress that requires a minor change in something.
|
|
|
|
|
|
#9 | |
|
Writing Anarchist
Join Date: Sep 2007
Location: lost among the words
Posts: 27,543
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Quote:
Many restaurants will do a BYOB (bring your own bottle) to get around the requirement of the liquor license. Something else you might consider as a block is the getting of a business license--which allows the business to open in the first place. In many cities, this requires an application to the city council and the owner's appearance at a council meeting to be approved. Neighbors (residential and commercial) within XX yards/miles of your business have the right to show up and voice their approval or disapproval of your business being allowed in their neck of the woods. Without that, it doesn't matter how much work you've put into the building, you're not opening the doors. If something came up at a council meeting and approval of the business license was tabled to the next meeting--that could be the weeks that you want and require your character to be tending to it in person.
__________________
"For unheard of means that it's undreamed of yet; Impossible means not yet done." --Julia Ecklar "You have your way. I have my way. As for the right way, the correct way, and the only way, it does not exist." --Friederich Nietzsche
|
|
|
|
|
|
|
#10 |
|
practical experience, FTW
Join Date: Jul 2012
Posts: 1,867
![]() ![]() ![]() ![]() ![]() ![]() |
It'd be simpler because there are a thousand things that can hold up, screw up, etc., a liquor license and while yeah, restaurants and such will do BYOB and charge a corking fee, I'd wager a nightclub will hold until they get the license in place.
Just seemed simpler to have it be the one thing that can go nearly any direction. |
|
|
|
|
|
#11 |
|
practical experience, FTW
Join Date: Dec 2012
Location: Georgia!!
Posts: 363
![]() |
A two to three week delay? Easiest would be a subcontractor who finished installing, we'll say, the sinks and toilets, as well as the wiring and drywall in the bathrooms WITHOUT getting the approval on the electrical and plumbing from code enforcement. They'd literally make him rip it out and re-do it.
It could be as simple as the sub just needed a check, and scammed the owner into thinking it was up to code, got his money and ran. Inspector comes in for another part, notices it wasn't done properly, and orders it 'fixed'. Then, even if it takes two days to redo, you still have to wait on the code enforcement officer to get back around to you. |
|
|
|
|
|
#12 | |
|
practical experience, FTW
Join Date: Jul 2012
Posts: 1,867
![]() ![]() ![]() ![]() ![]() ![]() |
Quote:
![]() If you do work that needs to be inspected and signed off on, you schedule an inspection. When the inspector doesn't show, as is apparently incredibly common, the contractor is then allowed to inspect it himself and sign off on his own work and that's totally valid. |
|
|
|
|
|
|
#13 |
|
Rincewind the writter
Join Date: Aug 2006
Location: BK.NY.US
Posts: 486
![]() ![]() |
Getting a liquor license in NYC requires Community Board approval, a needlessly abstruse process which has been known to add extra time for no apparent reason; the business owner does have an opportunity to plead his or her case before the board.
__________________
"Everybody must get stoned" --Medusa Projects for 2013:
The Impossibility of Motion|695 words The Listmaker|"How the Centipede Runs"|"Novus Ordo Seculorum"|"The Baffled King's Composition" NaNoWriMo 2013: Morrison Hardy |
|
|
|
|
|
#14 | |
|
Gave up trying to be good
Join Date: May 2012
Location: By the clear blue sea
Posts: 1,436
![]() ![]() ![]() |
Quote:
Building departments are not as persuadable as you might think. Ive been the director of city planning, zoning & building departments for, well, too many years. And no one ever successfully bullied me into issuing a permit or letting a safety issue slide.
__________________
![]() BookStrand * Amazon Blog * Twitter AW Library WIPS: Legends & Myths 2: Reaper's Redemption Shifter Sanctuary: Leashed The Devil's Triangle: Sink or Swim |
|
|
|
|
|
|
#15 |
|
God of the Oceans
Join Date: Oct 2012
Posts: 539
![]() |
It depends on the nature of the eror and who made it. Damages would be quite limited, and it is sometimes to evade regulations about which an error has been made. For example, if a plan were allowed that included X even though X had been banned for three years, then X might end up being allowed in that building. Even worse is when something is acceptable in one part of the code but forbidden in another section.
|
|
|
|
|
|
#16 | |
|
I'm killing bad guys
Join Date: Mar 2012
Location: NY
Posts: 450
![]() ![]() |
Quote:
Thank you everyone! I know what I'm going to do. |
|
|
|
|
![]() |